Share this post on:

Sthe heating balance calculation process proposed In order confirm the effectiveness of of your heating balance calculation strategy proin this chapter,chapter, this paper was depending on MATLAB andplatform in the win10 operatposed within this this paper was determined by MATLAB and GAMS GAMS platform inside the win10 ing system,system, and two.20 GHz processor atmosphere for simulation and optimization operating i7CPU i7CPU and 2.20 GHz processor atmosphere for simulation and optianalysis. The test case was case was constructed by combining the developing cluster strucmization evaluation. The test constructed by combining the constructing cluster structure of Figure 1.Figure 1. The building cluster in consists of three buildings.buildings. Since the ture of your constructing cluster in this case this case consists of 3 Because the physical processes of summer season cooling and winter heating had been really different, this paper GNE-371 custom synthesis mainly physical processes of summer cooling and winter heating were fairly distinctive, this paper solved the power consumption problem of creating cluster heat. Hence, the calculation mostly solved the energy consumption issue of developing cluster heat. Therefore, the atmosphere was set in winter. Assuming that one particular day inside the nearby winter, the external calculation environment was set in winter. Assuming that one day within the local winter, the temperature, electricity load curve, electricity value and natural gas cost, WT output and external temperature, electricity load curve, electrical energy cost and organic gas value, WT PV output from the 3 buildings were each of the same, as shown in Figures five [28,29]. The output and PV output of the three buildings were all of the identical, as shown in Figures five capacities of GB and ASHP were ten MW and 140 kW, respectively. The node diagram of [28,29]. The capacities of GB and ASHP had been ten MW and 140 kW, respectively. The node the heating pipe network was shown in Figure eight. The parameters of the heating network diagram in the heating pipe network was shown in Figure eight. The parameters on the heatpipes have been shown in Table 1. The upper and lower limits of the water temperature had been ing network pipes have been shown in Table 1. The upper and reduce limits with the water tem85 C and 60 C. The remaining constructing cluster parameters have been shown in Table two [30,31]. perature had been 85 and 60 . The remaining creating cluster parameters had been shown in Table two [30,31].Figure five. External temperature and electrical load.GYKI 52466 Cancer Sensors 2021, 21,9 ofFigure 6. Electricity cost and organic gas price.Figure 7. Output of PV and WT.Figure 8. Node diagram of heating pipe network. Table 1. Parameters of heating pipe network. Pipe Number p1 p2 p3 p4 p5 p6 p7 p8 p9 p10 Length (m) one hundred 800 600 300 700 700 300 600 800 one hundred Flow (m3 /h) 120 30 90 50 40 40 50 90 30Sensors 2021, 21,p6 p7 p8 p9 pTable 2. Parameters of constructing cluster.Table Parameter Name 2. Parameters of building cluster.700 300 600 80040 50 90 3010 ofGParameter Name m G Hvg m GB Hvg GB R R c cParameter Worth 150 kg/h Parameter Value 15 150 kg/h 9.88 kJ/m3 15 0.9 9.88 kJ/m3 0.9 265 (m C)/kW 265 (mC)/kW 4.two kJ/(kg C) 4.2 kJ/(kgC) 934.67 kg/m3934.67 kg/m5.two. Outcome Validity Analysis five.2. Result Validity Evaluation five.2.1. Iteration Outcome five.two.1. Iteration Outcome On the basis of your data in Section five.1, the model was solved according to the resolution On the basis of your information in Section five.1, the model was solved determined by the option process in Section 4.three. The iteration curve was shown in Figure 9, exactly where the ab.

Share this post on:

Author: calcimimeticagent